Tekapo Comms Mast

The installation of a new 18 metre steel mast was undertaken for Alpine Energy.

The mast was to ensure communications improvement in the Mackenzie Basin. Our highly skilled technical team worked with Alpine Energy to ensure that this job was done on time and with as little disruption as possible.