Washdyke Switching Station

The Washdyke Switching Station job consisted of the upgrade of network capacity to facilitate the additional load of the Woolworks electric boiler upgrade.

 

  • Work was completed by the Technical and Underground teams
  • Install new 11kV RMU switchgear
  • Work with Civil Contractors